新葡的京集团35222vip

Liyu Science and Technology Park Distributed Energy Station Project
release time: 2019-09-26    author:administrator

The construction scale of Liyu Science and Technology Park is: 4 sets 1MW gas-fired internal combustion generator sets, equipped with 2 sets 2.152 MW flue gas hot water type waste heat utilization units, and cooling equipment adopts 2 sets 1.044 MW screw type electric refrigeration units. The energy station has a total cooling capacity of 6.39 MW, a heating capacity of 3.44 MW, and a low-temperature supply of hot water of 70 t/d.